| Length | 41.75m |
| Width | 13.35m |
| Displacement | 455 tonnes |
| Excavator | Liebherr P984 100 tonnes |
| Dredging Depth | 17m |
| Aft Spuds | 2 x each 20m long x 20 tonnes |
| Forward Spud | walking type 24m long x 25 tonnes |
| Jack Up Capacity | 200 tonne |
| Dredging Control | Liebherr electronic monitor |
| Positioning Control - Hardware | Trimble NT 300D GPS |
| Positioning Control - Software | Trimble Hydro Pro Navigation |



